Results are our best reference
- All
- Timetable Planning
- Data Analysis
- Integrated Planning
- Concession Bids
- Research
- Software Development
-
Freight Strategy Study for Combined transport in Norway
Bane NOR (Norway)
Capacity analysis of power package 14 combined transport for T2033 (Norway)
-
Enhancing Rail Transport Planning Using Microsimulation and Stochastic Models
Jernbanedirektoratet (Norway)
A Case Study Based on the National Transport Plan (NTP) 2025-2036
-
Feasibility study Nord-Norgebanen
Jernbanedirektoratet, Multiconsult Norge AS (Norway)
Capacity and infrastructure planning for a new railway line in northern Norway
-
Impact of ERTMS and ATO on the Norwegian Railway Network
Bane NOR (Norway)
Enhancing Railway Efficiency: A Comprehensive Exploration of the Impact of ATO with ERTMS Integration on the Norwegian Rail Network.
-
Stage 5 Crossrail: Simulation of contingency plans
MTR Crossrail (UK)
Using simulations to prepare contingency plans in event of disruptions
-
Identifying system criticality of signals in a complex area
Network Rail (UK)
Simulation of recovery time after a failure as a measure of the criticality of signals
-
Analysis of operations on the Bergen line
Bane NOR (Norway)
Recommendations for improving punctuality on the Bergen line
-
UK Network Model Pilot development
Network Rail (UK)
Development of microscopic model import interfaces from GIS-based infrastructure database
-
Stage 5 Crossrail
Network Rail (UK)
Detailed timetable simulations for Stage 5
-
Toronto RER concession 2025 - 2056
Keolis-SNCF (Canada-France) (CA)
Consulting and assistance to the EnTransit consortium during the tender process for the development of the network and infrastructure evolution vision, timetable planning and operating concept
-
Tools for mathematical optimization of strategic railway timetable models
Jernbanedirektoratet (NO)
Design and development of an innovative tool for the automatic generation of timetables.
-
ERTMS for the Trønderbanen
Bane NOR (Norway)
Simulating ERTMS signalling and infrastructure upgrades with future timetable concepts
-
Long term planning of cross-border services between Italy and Switzerland
SBB (Switzerland)
Coordinated timetable and infrastructure design for the Italy-Switzerland cross-border services on the Gotthard axis in 2035
-
Performance modelling of the Southampton Freight Train Lengthening project
Network Rail (UK)
Robustness evaluation of the new timetables with the new Southampton Terminals layouts. Testing of different freight trains on the new infrastructure
-
Increasing services on the GWML
Network Rail (UK)
Understanding the performance of timetable options for additional services to operate on the Great Western Main Line
-
Estimation of time at red on the Digswell viaduct
Network Rail (UK)
Second test of an innovative KPI for capacity and performance studies
-
Norway Railway Network 2019 Traffic Capacity Analysis
Jernbanedirektoratet (Norway)
Network level capacity estimation
-
Los Angeles Metrolink
Metrolink (USA)
Introducing **treno**lab planning, simulation and analysis tools on Metrolink network
-
Measuring Time Signal at Red on the South Western Mainline
Network Rail (UK)
Testing a new metric for estimating capacity utilisation and quality of operations
-
Operational simulation of the Eglinton Crosstown Light Rail line
SNC Lavalin (Canada)
Evaluation of a mixed unserground at street-level line
-
Freight Strategy Study for Norwegian Railway Directorate
Jernbanedirektoratet (Norway)
Integrated service and infrastructure planning for national freight network in Norway
-
Barcelona Plaça de Catalunya
Ferrocarrils de la Generalitat de Catalunya (Spain)
Infrastructure design and evaluation for automatic train operation (ATO)
-
Norway Railway Network 2029 Traffic Capacity Analysis
Jernbanedirektoratet (Norway)
Network level capacity estimation
-
West Coast Partnership Timetable Design
MTR Europe Ltd (UK)
Timetable planning and performance modelling for a concession bid
-
Barcelona–Vallès Line
Ferrocarrils de la Generalitat de Catalunya (Spain)
Infrastructure and service planning study
-
Robustness of Eole-NExTEO
SNCF Transilien (France)
Dynamic simulation of the timetables in the Eole-NExTEO project and analysis of the stability of operations
-
Wales & Borders Concession Bid Timetable Design
MTR Europe Ltd (UK)
Timetable planning and performance modelling for a concession bid
-
Bay Area Rapid Transit (BART) Operations Analysis
SMA USA (USA)
Increasing timetable robustness on a rapid transit network
-
Assessing the Socio-economic Impacts of Railway Investments
Finnish Transport Agency (Finland)
Developing a method for assessing benefits of capacity and punctuality
-
CDG Express
SNCF Transilien (France)
Dynamic simulation of the CDG Express project
-
Lugano Train-Tram network
Lucchini - Mariotta e Associati SA (Switzerland)
Validation of the infrastructure layout of Lugano tram
-
Bergen and Dovre lines: 2027
Jernbaneverket (Norway)
Timetable planning and validation and definition of the infrastructure improvement measures for the Voss- and Tronder line in 2027
-
London Overground
MTR Corp. Limited (UK)
Timetable Planning and Performance Modelling for the London Overground Concession Bid
-
Greater Wellington
Serco (New Zealand)
Greater Wellington Rail Service: Timetable planning and performance modelling.